BOILER OR THERMAL MODULE BACKBOARD & FACADE
Sanitary & Heating Plumbing CELIA Range
DOWNLOAD PRICE LIST HERE DOWNLOAD INFORMATION CHART TO FILL INCheck out our 2min demo !
BOILER BACKBOARD PIPEWORK
The Celia backboard can be adapted for any brand of boilers on the market.
FEATURES
◦ General cut-off valve for drinking water
◦ General gas cut-off valve (automatic obturation valve) ◦ 2 to 6 gaz departures with PEX connections ◦ 2 to 6 cold water departures with PEX connection ◦ 2 to 4 hot water departures with PEX connectionCOMPOSITION
◦ Copper tubes hardened with anti-corrosion treatment
◦ CSTB 35432 approval ◦ Direction change : 2 % silver brazing ◦ Capillary : tin / silver / bronze soldering ◦ Brass connections ◦ 80 % recycled PVC support plateASSEMBLY
◦ 6 holes for wallmounting
◦ Enhanced setting frame: boiler support ◦ Sound proof tubes & color code bracketsPERKS
◦ 2 possible backsplash widths (500 mm / 600 mm)
◦ Possibility to add an automatic obturation valve ◦ Condensate recovery siphon Included ◦ Leakproofness tested on all assemblies ◦ Tight fittings in factory with PTFE jointsTHERMAL MODULE BACKBOARD PIPEWORK
FEATURES
◦ General cut-off valve for drinking water ◦ 2 to 6 heating departures with PEX connections
◦ 2 to 6 cold water departures with PEX connection ◦ 2 to 4 hot water departures with PEX connectionCOMPOSITION
◦ Copper tubes hardened with anti-corrosion treatment
◦ CSTB 35432 approval ◦ Direction change : 2 % silver brazing ◦ Capillary : tin / silver / bronze soldering ◦ Brass connections ◦ 80 % recycled PVC support plateASSEMBLY
◦ 6 holes for wallmounting
◦ Enhanced setting frame: module support ◦ Sound proof tubes & color code bracketsPERKS
◦ Condensate recovery siphon Included
◦ Leakproofness tested on all assemblies ◦ Tight fittings in factory with PTFE jointsCELIA Backboard Facade
A high-quality protection to avoid piping paint work for instance.
FEATURES
◦ A4 sized pocket fixed for storage of notices
◦ No tools needed for fixation to backboard ◦ Facade ventilation incorporated ◦ Width : 505 mm ◦ Depth : 150 mm ◦ Height : 1100 mmCOMPOSITION
◦ Glass fibre composite thickness: 2.5 mm
◦ White gelcoat ◦ Hook by sliding facade on 4 screws waiting on the backsplashCELIA Range
Our backboard pipework meets all the criteria expected before, during and after delivery of a construction programme.
SAVE HOURS OF WORKFORCE !
We guarantee, with support of customer returns, a significant save in hours of work on site. The backsplash also contributes to the reduction of risk of accidents on site.
EASY INSTALLATION
1. Fix the backboard to the wall through 6 dedicated holes.
2. Connect the manifolds 3. Then set up the boiler on the framework You’re done !RELIABILITY
For maximum reliability, all the hydraulic components of the backboard are tested at 6 bars of water pressure and all the fittings are already made on the pipework.
FLEXIBILITY
Fully modeled in 3D by our engineering office, the CELIA backboard fits all market boilers and thermal modules. For your specific needs, we can adapt our production!